Advertisement

Closure of B4114 Birmingham Road, Coleshill 

The work we will be completing

As part of the ongoing preparations for the HS2 railway construction, we will be carrying out essential works to construct a concrete wall immediately above the B4114, Birmingham Road, between the two viaducts. To carry out these works safely we will be installing a road closure. 

Full closure of the B4114, Birmingham Road: 
Start: 6am, Tuesday 5 May 2026 
End: 6am, Monday 18 May 2026 

Details: 

  • Our working hours will be from 7am to 6pm each day. 
  • The road closure will be in place 24/7 for the duration of the works 
  • Pedestrian and cycle access will be maintained throughout the closure 
  • Access to Woodlands Cemetery, the car boot sale field and Coleshill Manor Campus will be maintained from A452 Collector Road roundabout. 

HS2 Helpdesk 

If you would like to find out more about HS2, what it means for the local area and have your questions answered by HS2 and BBV team you can contact us on the below details: 

08081 434 434 
hs2enquiries@hs2.org.uk